Tesla Giga Berlin in Grünheide close to Berlin in Germany has progressed so much since we final time checked 4 weeks in the past.

With the simultaneous development of a number of services, it appears to be like virtually like a small metropolis. Within the flyover video launched on the flybrandenburg channel we see an enormous paint store facility, basic meeting facility, casting facility, switchyard, the muse for a stamping facility and an particularly useful prepare unloading space. Most just lately, the primary glass was put in on the drive unit constructing.

Tesla Giga Berlin - Paint shop - October 9, 2020 (source: flybrandenburg)

Tesla Giga Berlin – Paint store – October 9, 2020 (supply: flybrandenburg)

Tesla Giga Berlin - General assembly - October 9, 2020 (source: flybrandenburg)

Tesla Giga Berlin – Normal meeting – October 9, 2020 (supply: flybrandenburg)

Tesla Giga Berlin - First glass - October 9, 2020 (source: flybrandenburg)

Tesla Giga Berlin – First glass – October 9, 2020 (supply: flybrandenburg)

Tesla Giga Berlin - Switchyard - October 9, 2020 (source: flybrandenburg)

Tesla Giga Berlin – Switchyard – October 9, 2020 (supply: flybrandenburg)

Tesla Giga Berlin - Stamping - October 9, 2020 (source: flybrandenburg)

Tesla Giga Berlin – Stamping – October 9, 2020 (supply: flybrandenburg)

Tesla Giga Berlin - Train deloading - October 9, 2020 (source: flybrandenburg)

Tesla Giga Berlin – Prepare deloading – October 9, 2020 (supply: flybrandenburg)

Different reviews present reportedly leaked pictures from within the drive unit facility:

 

In response to Tesla‘s Elon Musk, the Giga Berlin plant will introduce a lot of pioneering technologies, beginning with Tesla Mannequin Y in 2021:

  • 4680 battery cells
  • structural battery packs
  • mega castings (entrance and rear a part of the automobile)
  • revolutionary paint course of (Geico Taikisha)

Sooner or later, the manufacturing unit will even produce all-new, not yet announced electric cars.

Extra movies:

Tesla Gigafactory 4 (aka Tesla Giga Berlin) at transient:

  • situated within the Berlin-area (in Grünheide, Brandenburg, Germany), close to the brand new airport
  • to supply Mannequin 3/Y beginning in 2021 with the Mannequin Y
  • will produce additionally batteries (for positive modules/packs) and powertrains
  • anticipated quantity of 500,000 yearly (unofficial goal), initially 150,000
  • anticipated funding of €4 billion (unofficial)
  • anticipated 10,000 jobs (unofficial)